Bloom provided construction inspection on STH 57 / Good Hope Road, a multi-faceted modernization project that removed the STH 57 overpass of STH 100. Project work included excavation, grading, roadway reconstruction, and roundabout construction. The project also included railroad crossing reconstruction near Deerbrook Trail, six traffic signal replacements, concrete overlay for the Milwaukee River bridge, and asphalt mill & overlay on STH 57 from Deerwood Drive to Mequon Road.