Bloom was the structural engineer of record for this project that constructed a two-story 12,188 ASF/18,750 GSF addition to the UW Police Department’s building, located at 1429 Monroe Street in Madison, WI. The addition provides private and open office space, conference and training spaces for the department, as well as a secure sally port entrance to the existing detainee unloading area so that officers have a safe area to load and unload detainees into the holding area.
The project also redeveloped the immediately adjacent site grounds. The new site improvements include site grading, pavements and storm water management features. New site utilities extend from adjacent street right-of- ways to serve the building addition and site improvements.